PPAP (Approval process) of Production Parts)
Module 1: Introduction and foundations of PPAP.
Module 2: Requirements for a process PPAP.
Understand the requirements that should of fulfill for develop a PPAP.
- Run of Production Significant.
- Requirements for PPAPs.
-
- Design Records.
- Authorized Engineering Change Documents.
- Customer Engineering Approval.
- Design Failure Mode and Effects Analysis (FMEAs (AMEFs) of Designs).
- Process Flow Diagram (s).
- Process Failure Mode and Effects Analysis (FMEAs (AMEFs) of Processes).
- Control Plan.
- Studies of Measurement Systems Analysis.
- Dimensional results.
- Records of Materials Test and Performance Results.
- Research of initial processes.
- Documentation from Qualified Laboratories.
- Appearance Approval Report (RAA).
- Sample parts for production.
- Master Samples.
- Checking Aids.
- Special customer requirements.
- Part Submission Warrant (PSW).
Module 3: Reporting and issuing requirements to customers.
- Notification to the clients.
- Issuance to customers.
Module 4: Evidence Levels – Submissions to Customers.
Module 5: Part submission status.
- Approved.
- Provisional Approval.
- Rejected
Module 6: Record retention.
Fill out the form to request more information
Our team will contact you shortly
This contact form is provided in Spanish.
