PPAP (Approval process) of Production Parts)​

Module 1: Introduction and foundations of PPAP.​

Module 2: Requirements for a process PPAP.​

Understand the requirements that should of fulfill for develop a PPAP.​

  1. Run of Production Significant.​
  2. Requirements for PPAPs.​
    • Design Records.​
    • Authorized Engineering Change Documents.​
    • Customer Engineering Approval.​
    • Design Failure Mode and Effects Analysis (FMEAs (AMEFs) of Designs).​
    • Process Flow Diagram (s).​
    • Process Failure Mode and Effects Analysis (FMEAs (AMEFs) of Processes).​
    • Control Plan.​
    • Studies of Measurement Systems Analysis.​
    • Dimensional results.​
    • Records of Materials Test and Performance Results.​
    • Research of initial processes.​
    • Documentation from Qualified Laboratories.​
    • Appearance Approval Report (RAA). ​
    • Sample parts for production.​
    • Master Samples.​
    • Checking Aids.​
    • Special customer requirements.​
    • Part Submission Warrant (PSW).​

​Module 3: Reporting and issuing requirements to customers.​

  1. Notification to the clients.​
  2. Issuance to customers.​

Module 4: Evidence Levels – Submissions to Customers.​

Module 5: Part submission status.​

  1. Approved.​
  2. Provisional Approval.​
  3. Rejected​

Module 6: Record retention.